As of December 2012 the operator, Statoil (now Equinor), made the investment decision and final approval of the field development plan by the UK authorities is in progress. The plan envisages a production, drilling and quarters platform based on a conventional steel jacket, exporting oil via a floating storage unit.
The oil is heavy and viscous, with API gravities of 12.1°–14.6° and viscosities ranging from 67cp in the field's Maureen reservoir to 508cp in the Heimdal reservoir. The small volume of associated gas will be used as fuel for the platform, and more fuel gas will be imported via a connection to the nearby Vesterled pipeline.