manager

Offshore control room, emergency exercise.

OIM, manager, oil and gas, rig, briefing, emergency response team.

Hello, 

Over the next couple of posts, ill like to show the different roles involved in the unlikely event of an emergency occuring. Today I will start with the control room. 

 

The alarms have sounded, and a scenario has been set. Everyone on board the platform is making their way to their allocated muster points, 

For exercise - We have a missing person and the O.I.M is briefing the emergency response team and what actions they are to take and provide them with information. 

BP Miller OIM, calling a muster, tannoy, addressing the crew, control room, muster, exercise,

For exercise, for exercise - the O.I.M keeps all persons on board updated on the situation. 

oil rig, emergency drill, fireteam muster

The scribe regularly logs the situation and ties all the information together in one place, to make it easier for the manager to make their decisions. 

OIM and his Deputy, reading, ER plan, Emergency response plan, control room, oil and gas, industry, emergency. Lee Ramsden

The O.I.M and his Deputy O.I.M, reading through the Emergency response plan, making descisions on what actions are required. 

Offshore - O.I.M

blog, OIM, offshore, installation, manager, boss, incharge, oil and gas industry, Ken Hamon, north sea, Petrofac, management, control of work, duty holder, BP, Saipem, BP Miller, construction, Lee Ramsden

The Petrofac O.I.M for the BP Miller decommissioning project.  

The Offshore Installation Manager (OIM) is the most senior manager of an offshore platform operating on the UKCS.

Many offshore operators have adopted this UK offshore management model and title and applied it to their operations in all global regions irrespective of the local regulations in force.

In the UK the individual must be officially registered as an OIM with the Offshore Safety Division of the Health and Safety Executive and the OIM is responsible for the health, welfare and safety of the personnel on board the installation, whether a drilling rig, production platform or a support vessel (e.g. a flotel).

Ken Hamon, Petrofac, OIM, offshore installation manager, north sea, BP Miller decommissioning, photography taken by, Lee Ramsden

 

Thanks

 

 

Lee

 

Please SUBSCRIBE for updates.