Congratulations for Petrofacs Industrial services Rope Access team, for doing an amazing job installing the buildings Christmas decorations :)
Through either a work rotation or weather, i have not physically been home for Christmas day since 2014,
and so just call me Mr Christmas as the Ramsden family are going the whole hog this year.
I hope that you all have a great time, either at home with your families, or if you are stuck at work, hope that you make up for it double when you return.
Thanks
Lee
If you have not yet SUBSCRIBED then please do,
Or head over to instagram and give me a follow
Hello,
Hope that you are you well.
Today i thought i would show a couple of images of different rope access teams.
The above image, is a technician abseiling down from working at the top of a leg on a jack up oil and gas platform.
These images may look like fun, but an 80m vertical ladder is not. Ha!
Take care and have a good week.
Lee
Be sure to SUBSCRIBE to keep up to date.
Good morning,
Today i want to show a vessel, this is one of many many vessels, that feed us, that bring us supplies and from the skippers and crews devotion and hard work keep the oil and gas industry working.
This is the Sea Falcon, operated by Solstad Offshore.
She was created in 2013, Length of 88.9m, Width 19.7m and a total 8732 bhp.
To keep up to date please subscribe.
Have a good week
Lee
Hello,
Today i would like to share three images, all taken within a few minutes on one another,
I thought it gives a good visual on the setting sun and blue hour.
Sometimes there isn’t a spectacular sun set.
With these industrial beauties, blue hour is my favourite as the contrast against the warm flood lights look amazing.
I hope that you have a good weekend,
Be sure to subscribe to keep up to date.
Lee
Hello and welcome
Today i’d like to show these two images of the Mariner A, Uk North sea oil and gas platform.
hope that you have had a great weekend.
and if you have not yet subscribed to my newsletter then please do below.
Lee
Hello,
Radio silence is over, nearly 18 months of not posting, i have an interesting catalogue that i would like to share and update this site with on a fortnightly basis.
Be sure to subscribe to my news letter for future updates.
Newsletters are on a monthly basis, in your inbox on 1st of each month.
No spam just nice images and information about the sites i have been shooting.
The above image is myself as rescue man on an 80 meter high jack up oil rig leg, whilst in dry dock having repairs.
Keep in touch.
Lee
Hello,
Today id like to share some images that I recently created.
At present I shoot products in my dining room, which is not ideal.
I am currently on the look out for a suitable space, If anyone has any suggestions or has a space I can use / share in the Lytham St Annes / Blackpool / Lancashire area then please use the contact page and let me know.
Kind regards,
Lee
Hi,
Today thought id she a couple of my images and how varied their usages can be.
The above image was taken back in 2009, on my first Dslr camera, an old Nikon D90. In comparison today, my iPhone can take better images.
This image of a street in Manchester has been purchased for the front cover of a fiction crime novel by the talented author Bill Rogers.
His publishers added the people and colour graded the image, but it is nice to see an image of mine in print.
My images are sold either directly, or through the stock site Alamy.
Once a sale occurs I am not privy to who the customer is, but with the powerful tools around, like googles reverse image search it is nice to find my images around the internet.
Lee
Hello, id like to share some images from another trip working up Blackpool's tower, repairing the illumination lighting at great height.
Arrived to site early and so I walked the long way there. Was surprised to see early morning council worker cleaning the front.
Ropes set, and decent underway. Always told "don't look down" but you have to in this game.
Today repairs ongoing to the heart light.
Sophisticated control gear, power the lighting on the Tower, helps it to change colour and be programmable.
A spectator while working at height.
Thanks for viewing.
Lee
Hello,
Today marks the final post in this series.
It finishes with the big finale - the heavy lift of the accommodation module.
Project manager looks on with anticipation.
Nearly 3000 tonnes being lifted, which is effortless for the Saipem S7000.
With additional tugger lines fitter, the huge load can be rotated on its axis and and with great prescission laid onto the deck of the S7000.
I hope that this series of blog posts over the last few months, have been of interest.
I have been working in the oil and gas industry for nearly 15 years and this has certainly been the most interesting project I have been involved in.
The decommissioning of North Sea oil and gas platforms are unfortunately something that we are going to see much more, as the price of oil falls, and the platforms are becoming a less viable option to maintain and keep running.
Thanks
Lee
Hello,
Today id like to show, the first couple of lifts.
Above image the rope access riggers, install the cranes lifting equipment.
Once landed the derrick is then sea fastened (welded) to the deck of the S7000.
The next lift to be completed was the helideck.
It was amazing to see these huge bits of an oil rig, look almost insignificant against the huge Saipem S7000 cranes.
Thanks
The Saipem S7000 arrives.
With its state-of-the-art J-lay tower, upgraded dynamic positioning capability and fast ballasting system, the Saipem 7000 semisubmersible crane vessel has the capacity to handle the entire workscope of offshore construction developments worldwide, encompassing pipelaying in water depths greater than 2,000 metres and heavy lift operations up to 14,000 tonnes.
The vessel’s Class 3 DP system of 12 thrusters ensures that the vessel maintains good station keeping in the most difficult of weather conditions. Additionally, because the Saipem 7000 has accommodation facilities up to 725 people, the vessel can assist hook-up and commissioning as well as initial platform life support activities.
Altogether, this high specification means that the Saipem 7000 can be counted on to provide the highest level of reliability for conventional, deep and ultradeep water development projects.
VESSEL FEATURES
Length overall 197.95 m
Upper platform 175 m x 87 m x 8.5 m
Lower pontoons 165 m x 33 m x 11.25/15.25 m
Depth to main deck 43.5 m
Free deck area 9,000 sq.m
Deck load 15,000 tonnes
Operating draft 27.5 m
Survival draft 18.5 m
Transit draft 10.5 m
Transit speed 9.5 knots
Today I want to show you the last ever flight to the BP Miller oil and gas platform.
Also give you an insight in what happens during a routine Helicopter crew change.
The H.L.O gives permission for a flight to land on the deck.
Offshore worker, happy to be returning to work.
Arriving offshore workers in their survival suits picking up their luggage and leave the helideck.
Bristows Helicopter pilot.
Helideck team get ready the refuelling hose.
A Bristows, Sikorsky S92 Helicopter being refuelled on the oil and gas platform.
Departing offshore worker.
Button her up, time to leave.
As this was the last flight, the pilot was happy to conduct a fly by :)
Hello, today we see the last evening meal that the catering crew served on the BP Miller.
Certainly marked a large mile stone for the life of the platform.
The O.I.M's place is set. A chilled bottle of blue (non alcoholic) Becks at the ready.
Taking photos of the menu.
The catering crew produced a fantastic meal.
Catering team, proudly showing off their hard work.
A couple of images of the platform medic who was also the appointed radiation protection supervisor conducting some LSA / NORM inspections on redundant pipework.
Hello,
Today id like to show some images of an asbestos inspector conducting a survey of different materials.
Hello,
Today id like to show some of the IRATA rope access technicians that were involved in the decommissioning of the BP Miller.
Welding on dead weight supports to the risers.
Rope access welder cutting a riser.
Long tiring climb back up.
Rope techs at height happy in their work.
Hello,
Today id like to show some images of large task involved when safely decommissioning an oil and gas rig. The task is called breaking containment.
Where pipework has to be cut or flanges opened, we have to prove what was inside the pipe work previously, to ensure that it is safe via a gas test.
To prove that the pipe is safe to cut a gas test is required. As the pipework has not yet been proven safe, all this is conducted under full breathing apparatus to protect the technicians drilling into the pipes from hazardous substances.