Offshore Emergency rope access response exercise.

IRATA, rope access, casuilty, dummy, rescue, ermgency team, working at height rescue, plan,  photo by Lee Ramsden

Hello, 

Today we see another emergency exercise. As you can see in the oil and gas industry we regularly drill and test the emergency response plan. 

It is the old adage -  fail to prepare, prepare to fail. 

It is a legal requirement to have a plan on what to do in an emergency, but does it work? 

Testing different scenarios on a regularly basis ensures that the plan works, and keeps the emergency response team skills fresh. 

 

Todays scenario, is in the above image. In this case we are using an inanimate dummy. But it is to practice how to rescue a rope access worker, working under deck. 

IRATA, rope access technician, donning, harness, getting ready, industrial worker, working at height.

IRATA rope access technician donning his harness. 

IRATA, rope access, rescue, level 3, hauling casulty, offshore, photo by Lee Ramsden

The rope access supervisor, using his equipment to haul the pretend casualty up to the deck. 

fire man, moviing casuilty, injured, exercise, practice, industrial photographer.

Platform fire team member safely has hands on the practice casualty. 

Blog, fireteam, emergency response, firstaider first aid, medic, north sea, photo by Lee Ramsden

The platform Medic and his first aid team, practice administrating first aid, and using the different types of stretchers required. 

casuilty on a stretcher, medical team, responding, offshore, oil and gas industry.
emergency response, drill, fireman, firemen, casuilty, Lee ramsden

Platform medic, coordinates the fire team members on lifting the stretcher and places it into the "frog", to lift the practice casualty from the lower levels of the platform, up to the installation sickbay. 

Blog, fireteam, emergency response, frog personnel transfer, north sea, photo by Lee Ramsden

Fire team leader, in communications with the crane operator. They safely lift the practice casualty to the platform sickbay. 

Fire team emergency response exercise.

blog, Fire team, fire chief, weekly, excercise, drill, muster, practice, oil and gas industry, industrial, firemen, rig, platform, BP Miller, Petrofac, Lee Ramsden 01

Hello, 

Following on from last weeks post, today we see the Emergency response team practicing if there was an emergency inside the accommodation. 

Above is the fire team leader, his role here is directing his fire team, maintaining communications between his team, and the platform control room. 

Emergency response, exercise, breifing, offshore,, oil and gas

The O.I.M setting the scene, and briefing the emergency fire team.  

For exercise - there has been indication of smoke inside the accommodation. 

fire team leader, FLT, offshore, oil and gas, industrail, fire man, firefighter, briefing

Fire team leader, briefing his team on a suspected accommodation fire indicated on the panel. 

blog, Fire team, weekly, excercise, drill, muster, practice, oil and gas industry, industrial, firemen, rig, platform, BP Miller, Petrofac, Lee Ramsden 02

Fire team, updating the leader with information. 

fire men, accomodation fire, exercise, drill, practice, door technique, door drills, back of hand, testing, Jim Coyle, James Coyle, north sea, offshore, oil and gas industry, photo by, Lee Ramsden

Fire team, practicing safe fire door drills. 

Emergency response, exercise, breifing, offshore,, oil and gas

O.I.M and his Deputy, reading through the Emergency response plan.

Emergency response, exercise, breifing, offshore,, oil and gas

O.I.M updating the platform personnel, on the situation. The deputy O.I.M calling the coast guard, for exercise purposes informing them of our drill, and establishing helicopter response times.

Emergency response, exercise, breifing, offshore,, oil and gas

The scribe, updates relevant information, like wind direction and sea conditions incase we needed to evacuate. 

Offshore control room, emergency exercise.

OIM, manager, oil and gas, rig, briefing, emergency response team.

Hello, 

Over the next couple of posts, ill like to show the different roles involved in the unlikely event of an emergency occuring. Today I will start with the control room. 

 

The alarms have sounded, and a scenario has been set. Everyone on board the platform is making their way to their allocated muster points, 

For exercise - We have a missing person and the O.I.M is briefing the emergency response team and what actions they are to take and provide them with information. 

BP Miller OIM, calling a muster, tannoy, addressing the crew, control room, muster, exercise,

For exercise, for exercise - the O.I.M keeps all persons on board updated on the situation. 

oil rig, emergency drill, fireteam muster

The scribe regularly logs the situation and ties all the information together in one place, to make it easier for the manager to make their decisions. 

OIM and his Deputy, reading, ER plan, Emergency response plan, control room, oil and gas, industry, emergency. Lee Ramsden

The O.I.M and his Deputy O.I.M, reading through the Emergency response plan, making descisions on what actions are required. 

Highest point in the north sea.

blog, Flare view, heighest point, in the, north sea, 162m, BP Miller, oil, gas, rig, platform, Aberdeen, BP,Petrofac, Saipem, Lee Ramsden industrial photographer

The BP Miller, has the tallest flare stack in the North Sea, at 162m high, 

(4m taller than Blackpool tower)

blog, Flare view, rope access, IRATA, industiral, technicians, top of BP Miller, danny king, Petrofac, BP, Saipem, ACN, Steve thorogood, Lee Ramsden, photographer, photography.

Caught our breath back, after a lung busted 15 ladder climb. 

blog, Flare view, pointing, rope access, IRATA, industiral, top of BP Miller, danny king Petrofac, BP, Saipem, ACN, working at height.
blog, Marathon oil, brae Alpha platform, Lee Ramsden, occupational, photography, photographer, industrial, oil and gas, industry

Image of the Brae Bravo platform, from the top of BP Miller flare. 

Crane operator, working the supply vessel.

blog, crane, operations, boat, ship, vessel, supply, norh sea, Sparow, BP Miller, Petrofac, Saipem, deck crew, loading handling, Aberdeen. 05

Hello, 

Today ill like to show how an oil rig offloads new supplies, which range from equipment, tools and most importantly food! 

blog, crane, operations, boat, ship, vessel, supply, norh sea, Sparows, Angus Taylor, Scottish, Scotland, BP Miller, Petrofac, Saipem, deck crew, loading handling, Aberdeen. 03
blog, crane, operations, boat, ship, vessel, supply, norh sea, Sparows, Angus Taylor, Scottish, Scotland, BP Miller, Petrofac, Saipem, deck crew, loading handling, Aberdeen. 04
blog, crane, operations, boat, ship, vessel, supply, norh sea, Sparows, Angus Taylor, Scottish, Scotland, BP Miller, Petrofac, Saipem, deck crew, loading handling, Aberdeen. 02
Crane Ops 01.jpg
load handler, hi-viz, vest, sign, oil rig, deck, banking, rigger, slinger, banksman, storeman, materials, coordinator, offshore, photo by Lee Ramsden.

While it is down to the crane operator to offload the containers from the supply vessel, it is all orchestrated by the offshore materials coordinator. 

The materials controller duties:

  • Arranging for the despatch and delivery of materials and goods

  • Making sure that materials and equipment have the necessary certification.

  • Ensuring that relevant stores are aware of deliveries and that they allocate space for goods on arrival.

  • Chasing up suppliers to ensure goods and materials are delivered on time to meet business needs.

  • Maintaining the materials management system.

  • Preparing reports on materials receipt and delivery and on the performance of suppliers

  • Acting as a focal point for suppliers and internal departments for questions about materials scheduling, problems, and the like.

offshore, north sea, crane, lifting containers, to the boat, supply vessel, oil and gas industry, photo by Lee Ramsden
offshore, container, materials, lifting, rigging, slinging, blue ISO container, waste, materials, scrap metal skip, BP miller, decommissioning, construction, oil and gas industry
North sea, supply vessel, crew, offshore, seamen, Norweigan, Norway, UK, Scotland, boat, ship, deck, deck crew, container, crane, operations, photo by Lee Ramsden.

Norwegian supply vessel crew, unhooking the containers. 

Load handler, Storeman, wokring the boat, materials coordinator, Ali Wilkinson, deck crew, oil and gas industry, north sea, Cape, professional photography by Lee Ramsden

25 years of rust, in the North sea.

 

 

Here, are two images 25 years apart. 

The images are of the "pig launchers", on the cellar deck of the BP Miller platform,

one while the platform was being commissioned, and put together,

and the second, while decommissioning.

 

 

Thanks

 

 

Lee

Offshore, oil and gas rig catering crew.

blog, Catering, chef, campboss, hotel manager, incharge, cooks, kitchen, working, industrial, aramark, offshore, north sea, BP Miller, Petrofac, hotel, Photo by Lee Ramsden.

 

Today we meet, the small team involved in feeding and looking after all 80 workers, on a North Sea oil and gas platform. 

These guys do a fantastic job, with such a small team in cleaning, preparing meals and trying to keep moral high for a large crew of guys. Who are working hard in all weathers, away from home for long periods, missing their families.

It is un-measurable their involvement, but any rig worker will tell you, that a clean accommodation and a good hearty meal, makes for a happy crew. 

blog, Catering, steward, Stan Macintosh, aramark, offshore, north sea, cleaning, cleaner, hospitality, oil rig, BP Miller, Petrofac, hotel, Photo by Lee Ramsden.
blog Catering, chefs, cooks, kitchen, working, industrial, aramark, offshore, north sea, hospitality, oil rig, BP Miller, Petrofac, hotel, Photo by Lee Ramsden.
oil and gas, sunday roast beef, yorkshire pudding, carvary, chef, offshore, north sea, Ronnie Lambert, portrait, by, Lee Ramsden

Roast beef, and Yorkshire puddings... must be Sunday! 

People, made out of food

 

Thanks

 

Lee

 

subscribe

BP Miller decommissioning core crew.

BP Miller, decommissioning, offshore, Petrofac, core crew, photo my lee ramsden

This fine body of men.... 

Are one half of the Petrofac core crew involved with the mammoth task of decommissioning and removing a north sea oil rig. While this crew is offshore, our opposite numbers are at home on leave. 

This group is made up of the management, technical authorities, and lead technicians, that are required on board to keep a rig running safely.

Ken Hamon, Petrofac, OIM, offshore installation manager, north sea, BP Miller decommissioning, photography taken by, Lee Ramsden

Petrofac O.I.M.

Stuart Nuttall, Petrofac, Project Manager, offshore installation manager, north sea, BP Miller, OIM, decommissioning, photography taken by, Lee Ramsden

Petrofac Project Manager.

Simon Power, Petrofac, Project Manager, offshore installation manager, north sea, BP Miller, OIM, decommissioning, photography taken by, Lee Ramsden

Petrofac Project Manager.

The above, were the Petrofac offshore management for the project, all with different attributes and experiences, but all shared one key value - people skills.

You can be the most knowledgeable leader, but if your team are not supporting you, then you might as well give up.

These gents led by example, with integrity, and support. When the chips were down, could pick the whole team back up. Inspirational. 

 

BP, Miller, Petrofac, Core crew, oil and gas industry, offshore, north sea.jpg

Now we called in back to backs and so all the core crew now on board, for the task of shutting down the platform. A mammoth task, completed with safety at the forefront and ahead of the schedule.  

Offshore - O.I.M

blog, OIM, offshore, installation, manager, boss, incharge, oil and gas industry, Ken Hamon, north sea, Petrofac, management, control of work, duty holder, BP, Saipem, BP Miller, construction, Lee Ramsden

The Petrofac O.I.M for the BP Miller decommissioning project.  

The Offshore Installation Manager (OIM) is the most senior manager of an offshore platform operating on the UKCS.

Many offshore operators have adopted this UK offshore management model and title and applied it to their operations in all global regions irrespective of the local regulations in force.

In the UK the individual must be officially registered as an OIM with the Offshore Safety Division of the Health and Safety Executive and the OIM is responsible for the health, welfare and safety of the personnel on board the installation, whether a drilling rig, production platform or a support vessel (e.g. a flotel).

Ken Hamon, Petrofac, OIM, offshore installation manager, north sea, BP Miller decommissioning, photography taken by, Lee Ramsden

 

Thanks

 

 

Lee

 

Please SUBSCRIBE for updates. 

Rig removal. North sea.

blog, Rig burning, welding, oxygen, acetylene, cutting, BP Miller, Decommissioning, industrial, removal, Saipem, Petrofac, BP, Lee Ramsden, hotwork 01
Blog, welding on the ropes, rope access, IRATA, abseiling, industrial, lee ramsden, BP Miller, oil and gas rig, north sea, offshore, employment, redundancies, oil and gas industry, BP, Petrofac
blog, Rig burning, welding, oxygen, acetylene, cutting, BP Miller, Decommissioning, industrial, removal, Saipem, Petrofac, BP, Lee Ramsden, hotwork 02
blog, Rig burning, welding, oxygen, acetylene, cutting, BP Miller, Decommissioning, industrial, removal, Saipem, Petrofac, BP, Lee Ramsden, hotwork 03
BP Miller, decommissioning, Petrofac, Saipem, BP, buring, oxygen, acetylene, rig removal, industrial, north sea, photo taken by Lee Ramsden
BP Miller, decommissioning, Petrofac, Saipem, BP, buring, oxygen, acetylene, rig removal, cutting, burning,  industrial, north sea, photo taken by Lee Ramsden
BP Miller, decommissioning, Petrofac, Saipem, barries, chain, lifting, crane, steel beam, BP, buring, oxygen, acetylene, rig removal, industrial, north sea, photo taken by Lee Ramsden

North sea oil and gas rig.

blog, Flare view, heighest point, in the, north sea, 162m, BP Miller, oil, gas, rig, platform, Aberdeen, BP,Petrofac, Saipem, Lee Ramsden industrial photographer
blog, Rig burning, welding, oxygen, acetylene, cutting, BP Miller, Decommissioning, industrial, removal, Saipem, Petrofac, BP, Lee Ramsden, hotwork 01
S7000 north sea, lifting vessel, Saipem, italian
Lifting vessel, heavy, 14 thousand tonnes, S7000, Saipem
Saipem 7000, heavy lifting, vessel

Hello, long time no see...

Lee Ramsden, portrait, selfie, health and safety advisor, rope access supervisor, lancashire, professional, photographer, photography.

 

 

Well... Hello, its been a while. 

Lets catch up, 

Most will know, that my day job is working in the oil and gas industry.

Since January i have been involved with the decommissioning of a north sea oil and gas rig, called the BP Miller. 

The picture taking had to take a back seat. The next post will explain in more detail what the project entails. 

But stick around, i have uploaded lots of content which will be coming out on a weekly basis, a new post every Sunday. 

So please subscribe, and follow the story and images of life offshore in the oil and gas industry on a decommissioning project. 

Thanks

Lee

blog, Fire team, selfie, breathing aparatus, edited, stylised, torch, Lee Ramsden, photo of lee ramsden, monochrome.

Electronic shutter vs Mechanical shutter.

fuji x-t1 manual shutter displaying movement

Hi,

just a quick one as i am sure a lot of you are more experienced with this than myself. 

Whilst traveling to work i was taking some pictures on the flight. To avoid the cabin crew scowl i turned the Fuji X-T1's shutter from Mechanical to electronic. 

It is permanently set on the Mechanic mode, as in the past, i accidentally put it onto electronic and it would not fire the off camera flashes. To prevent that happening again, it is a setting i do not change. 

This occasion due to the silence of the electronic shutter, it would be a perfect solution.

Just for a demonstration and comparison, as i didn't want to take pictures of the planes propellers.

Have a look at the two images. The top image is the conventional mechanical shutter. And the lower is the electronic. I found it really interesting how the shutters create different images. 

 

Thanks

Fuji X-T1 Electronic shutter causing mishaped movement long exposures

View from Blackpool Tower.

01 Blackpool FC football ground Bloomfield road Tangerine army Lancashire Photograph by Lee Ramsden

Blackpool football club Bloomfield road.

Hi following on from my last post. I thought i would share some images taken from the top of Blackpool tower. 

02 The big one roller coaster Pleasure Beach Blackpool Lancashire Fylde Merlin Photograph by Lee Ramsden

Pleasure beach. 

03 Blackpool Winter Gardens Theatre 97 Church St FY1 1HL Lancashire photograph by Lee Ramsden

Winter Gardens Theatre.

04 Blackpool Funny Girls burlesque cabaret showbar North Shore Lancashire The Pink Leisure Basil Newby photograph by Lee Ramsden

Funny Girls burlesque cabaret showbar.

05 Blackpool Fylde Lancashire roof tops view from top of the Tower England abstract photography by Lee Ramsden

Roof tops.

06 Blackpool Central promenade Lancashire Ambulance service on response call photograph by Lee Ramsden

Lancashire Ambulance service.

07 Blackpool Fylde Lancashire taxi cab roof tops view from top of the Tower England abstract photography by Lee Ramsden

A towns taxi cab.

08 Blackpool Fylde Borough council Lancashire photograph by Lee Ramsden

Offices.

09 Blackpool Lytham Road Fylde B5262 Lancashire traffic roof tops view from top of the Tower England abstract photography by Lee Ramsden

Lytham road B5262.

Top of Blackpool Tower.

Blackpool Tower LED lighting dusk illuminations prom lights Landscape photographer Lee Ramsden

Have you ever wondered,  - how do they maintain the iconic lights on Blackpool Tower?

02 Wesley Berry Wez top of Blackpool Tower changing the light bulbs IRATA rope access photography by Lee Ramsden

Well meet Wez Berry, the lighting engineer that looks after the famous Blackpool Tower and regularly abseils 518 ft down the iconic landmark, to ensure its computer-operated 225,000 LED bulbs are in working order.

03 Wesley Berry service lift to the top of Blackpool Tower changing the light bulbs IRATA rope access photography by Lee Ramsden

The day starts early to catch the lift to the top. 

04 Wesley Berry Wez Blackpool Tower Lift changing the light bulbs IRATA rope access photography by Lee Ramsden
05 Blackpool Tower Lift View photography by Lee Ramsden
06 Wez Berry at the top of Blackpool Tower Lancashire photography by Lee Ramsden

Wez's workplace has a view like no other. 

“You're your own boss up here, You can crack on and do your own work.”

The location is extremely weather dependent, with extreme winds and rain meaning it simply isn't safe to scale the Tower's dizzy heights. 

“If the weather's nice, we're on, and I'll work through weekends and bank holidays,” 

“The wind really does restrict us and you have to look at the forecast very carefully."

“You've got to come into work safe and go home safe – it's very much safety first and I always have a rope access supervisor in case anything happens to me up there."

"We work closely with CJIS-LTD who provide the highly trained rope access supervisors who manage the working at height, utilising IRATA techniques"

07 Wesley Berry Wez top of Blackpool Tower changing the light bulbs IRATA rope access photography by Lee Ramsden
08 Wesley Berry Wez top of Blackpool Tower changing the light bulbs IRATA rope access photography by Lee Ramsden
09 Wesley Berry Wez top of Blackpool Tower changing the light bulbs IRATA rope access photography by Lee Ramsden

Wez -"we're working off 100 metre ropes. It doesn't scare me because whether its 20 feet or 500 feet there's no messing about and you've got to give it the same respect.”

Even when the lighting engineer is at home, he can see the Tower from his back window and he'll often get a call from work mates asking him to check on the lights.

“Plus everyone round here knows what I do, they love to criticise and tell me if they see a light out,”.

10 Highest Light fitting in Lancshire Fylde Borough council Lee Ramsden LED illuminations

The tallest light fitting in Lancashire. 

11 Wesley Berry Wez top of Blackpool Tower changing the light bulbs IRATA rope access photography by Lee Ramsden

The top is a mecca for tourists, who flock to the terrifying glass floor known as the SkyWalk. Often, they will catch a glimpse of Wez hanging underneath.

13 Wesley Berry Wez top of Blackpool Tower changing the light bulbs IRATA rope access photography by Lee Ramsden

To illustrate just how high todays worksite was. 

For more information on how to conduct working at height safely please use the contacts page. 

If you are or interested in becoming a rope access technician or require additional training i can recommend this training venue Based in Blackpool. 

 

Thanks

Lee

Photography tool - image stitching.

11 SKN electrical office front Aberdeen oil and gas industry

Good morning, i hope that you are well. 

Today i'd like to share a quick thought on how you can use image stitching to over come problems.

I appreciate that this is nothing new, but with some fore-thought it can become a powerful tool in your arsenal. 

I was commissioned to shoot an office building. The front had no access due to very limited space and parked cars in my way. Even with the lens at 24mm it was simply impossible to fit the building into frame. So stitching is the only way forward. 

The above image was created with around 25 images. 

Here you can see the images used, 

the camera was mounted on a tripod and i systematically panned left to right making sure to over lap alot. The building took 3 passes.

Always best to have more frames than needed, than have pieces missing down the line. 

With each up date of Photoshop CC i have noticed that it is becoming much better at stitching. 

In the past it would have not been able to do this, and for these cases i use Autopano Giga 3.0 stitching software, but photoshop managed ok with this. 

Now by using a tilt shift lens, and/or a parallax tripod head, your job in post will be so much easier, but as i do not own either of these i had to make do. The majority of my time was spent straightening the stitched image. 

As with all panos, shoot in manual, turn white balance off auto so all the images remain consistent. 

I hope that this helps, and when you are trying to shoot a subject larger than your frame, that you remember this technique. 

 

Thanks

 

Lee

Scene lighting technique.

Nikon D800 f7.1 1/8th ISO100

Good morning, 

Id like to share with you a lighting technique that you can use to light a scene, even when working on your own. 

The above image consists of 21 images, all shot and lit by myself, and i am even in the image, to add some interest. 

I will show you, how i take multiple images, all lit with off camera flash, and then the process i take in photoshop.

 

02 Off camera flash wireless trigger pocket wizard boom illuminating the scene

Here you can see me using an off camera flash head on a pole, with the trigger in my right hand firing off the flash and camera shutter remotely. 

Click on image to enlarge.

The final image is composed of 21 frames. 

The camera was mounted on a tripod. White balance taken off auto, manual settings, and with me using back button focusing on the camera, i know when i press the remote, the camera will not try and focus, making all the images consistent. 

05 Start image quick tip on how to flash light

Quick tip, 

Like when making panos, my first image is a large image of me, so i can find the set easily in bridge. 

Also this is a great way to make sure that the flash and camera shutter both fire correctly. 

As when using pocket wizards as the remote, the flash PW has to be set to a channel higher and some times i forget this, and so it is always a good idea to test everything before getting started and walking far into the scene. 

04 adobe bridge using photoshop tools loading layers

Using bridge i select all the images that i want to use, and from here you can easily load them into photoshop as a single document with 21 layers. 

06 using lighten blend mode in photoshop CC

Now turn off all layers, and starting from the bottom layer i work my way up through the stack, turning on, one layer at a time, changing the blend mode to Lighten. 

07 using a mask in photoshop CC

With the blend mode on lighten, the flash light will show. 

Also you will see indicated in this image the hot spot of the flash is in the image. This is easy to mask out. Also i remain in the image by some strange artefacts, just simply mask these out. 

After some cleaning and tweaking here is the before and after image.

The before being unlit. 

It is a subtle difference, but one i find takes your images to that next level. 

If you have any questions, feel free to comment and i hope to help. 

 

 

Thanks

Lee